Preparation & Technical Inspection:

Before work begins, HEIZICHT reviews the available foundation design, site conditions, execution requirements and relevant technical documentation. Potential risks and critical points are identified in advance, providing a clear basis for independent inspection during execution.

Preparation & Technical Inspection:

  • Foundation design and latest drawings
  • CPT data and soil conditions
  • Pile type, pile configuration and relevant calculations
  • Structural design criteria
  • Installation method and work sequence
  • Project-specific risks and environmental factors
  • Relevant materials, certificates and project documentation
  • Changes and deviations from the approved design
  • Coordination with the structural engineer, contractor and other involved parties
  • Verification of relevant execution requirements prior to commencement

On-Site Supervision

During piling operations, we inspect and record, among other things:

  • Pile position, dimensions and pile identification
  • Correct pile type and pile length
  • Verticality and any deviations
  • Driving records and final set values
  • Pile penetration behaviour during driving
  • Pile damage and other irregularities
  • Connections between composite pile sections
  • Final depth and achieved pile level
  • Relevant installation data for each pile
  • Deviations from the design and CPT data
  • Interruptions and irregularities during the piling process
  • Documentation of inspection and execution data

Inspection of Bored and Screw Pile Installation

During bored and screw pile installation, HEIZICHT independently inspects and records key execution parameters, including:

  • Pile position, identification and drilling alignment
  • Drilling depth and achieved pile level
  • Critical drilling and installation parameters
  • Grout or concrete consumption for each pile
  • Injection pressure and continuity during installation
  • Interruptions, irregularities and anomalies during the drilling process
  • Reinforcement installation, where applicable
  • Deviations from the foundation design and CPT data
  • Relevant installation data for each individual pile
  • Verification of drilling records and execution documentation
  • Identification and reporting of technical irregularities during execution
  • Complete documentation of inspection findings and installation data

All relevant findings and deviations are documented to provide a clear and traceable record of the foundation works.


Our Expertise and Approach

HEIZICHT combines extensive practical experience with independent technical inspection of foundation works. We carefully assess on-site execution, identify deviations and maintain clear, traceable records of all relevant installation data.

Our approach is practical, professional and transparent, providing clients, engineers, contractors and other involved parties with reliable technical information throughout the entire foundation process.